What a plan is
The Planning page states it in one line:A plan is a task list the model can build and keep up to date while you work. Start one here, or ask for one in any chat.
A plan is not a calendar. It carries no dates, because what it tracks is what is left to do, not when it happens. Two nearby things are often mistaken for it:
Start a plan
- From the Planning page
- From a chat
1
Open Planning and choose New plan
The dialog explains itself:
A title, and one step per line. Bullets and numbers are stripped, so a list can be pasted straight in.2
Enter a Title
Up to 200 characters. The placeholder shows the shape it expects, for example
Ship the pricing page.3
Optionally fill Steps
One step per line. Pasting a bulleted or numbered list works as is, because the bullets and the numbers are stripped for you.
4
Choose Create plan
The plan opens. If it cannot be saved you see
The plan could not be created.Work through the steps
Open a plan from the list. All plans takes you back.- Tick a step to move it from
To dotoDone. Ticking it again moves it back. Clicking only ever cycles between those two. - Add a step with the field at the bottom, up to 500 characters, then Add.
- The progress bar reads how many of the plan’s steps are done.
- Delete plan removes the plan. It does not touch the conversation it came from.
No steps yet. Add the first one below, or ask in a chat and the model will fill it in.
Statuses
A plan has a status, but you rarely set it. The status is derived from the steps, and ticking the last box closes the plan on its own. The Plan status control is there when you want to override it.Doing and Skipped exist because the model sets them as it works. You cannot reach them by clicking a step.Filter the list
The list carries a status filter with four options:All, Draft, In progress and Done. The filter is applied in your browser, so it is instant, and the list itself shows at most fifty plans.
Each row shows how many of its steps are done, a relative timestamp, and the From a chat marker when the plan was spawned from a conversation.
Two empty states tell you which situation you are in. With no plans at all: No plans yet, followed by A plan turns a long answer into steps you can tick off. Create one, or ask a chat to plan the work and it will appear here. With a filter that matches nothing: Nothing in this status, followed by Try another status, or start a plan.
When an action fails
Every failure is a short sentence and nothing is half-applied. You will see one ofThe plan could not be created, The step could not be added, The step could not be updated, The step could not be deleted, The status could not be changed, or The plan could not be deleted. Retry the same action; if it keeps failing, check status.cortex.foundation.
Related
- Scheduled tasks - run a prompt on a cadence, which is the time-based surface Planning is not.
- Projects - standing instructions and files behind a group of chats.
- Deep Research - the research plan, a brief rather than a task list.
- Conversations - the thread header where Start plan lives.
- Built-in tools - what the model can reach while it works a plan.